The Municipality of Clarington is planning to reconstruct and urbanize Albert Street and Durham Street in Bowmanville, between Duke Street and Brown Street (approximately 240m in length each).
The project design phase is expected to be completed in 2026. It includes:
Construction will be scheduled after the design is completed.
A Public Information Centre will be held to present the proposed design and collect feedback from residents and stakeholders. Updates will be posted once a date is scheduled and details are confirmed.
For more information or to provide comments, please contact:
Matt Holmes, P.Eng.
Capital Works Engineer
Planning & Infrastructure Services Department
905-623-3379 ext. 2441 | mholmes@clarington.net
Robert Brezina, P. Eng.
Manager of Engineering Design
Planning and Infrastructure Services Department
905-623-3379 ext. 2331 | rbrezina@clarington.net
Contact Us